Module 5: Time, Meetings and Getting Things Done

This module shows how to protect your time, run meetings and retros that work, delegate well, and finish the projects that stall. Use it when your calendar is full but your team's work is not moving.

Start module Module 5 of 6 · 5 lessons

5.1

How to take back your calendar

A manager's calendar fills up with meetings, and the time for focused work and thinking disappears. This lesson covers how to measure your time against your job, how to cut and reshape meetings, and how to stay informed without a meeting for everything.

Know what your time is for

Francisco Trindade, a VP of Engineering at Braze, explains in his guide to effective time management why this starts with your role. If you do not organize your time actively, activities of little value naturally fill your calendar. That takes hours away from you and hurts your team's effectiveness.

Trindade sums up a manager's job as two goals, which you work toward across three areas.

A MANAGER’S JOB · TWO GOALS An effective team that delivers business results, and a stable environment for that team. WORKED ON ACROSS THREE AREAS People A team environment where engineers are fulfilled and grow in their careers. Technology The team’s technical output and direction match the company’s strategy and needs. Process Effective team practices and habits that create a productive environment.
Scroll sideways →Source: A leader’s guide to effective time management.

To manage your time actively, write a "job description" for your own role, with all your responsibilities and goals. Track your daily tasks against it for a few weeks. You will see which areas take too much time, and which get too little. Review the job description every three to six months.

Leave room for focused work and for slack to handle urgent issues. Trindade's rule of thumb is to keep at least 30% of your calendar free of meetings.

Plan your calendar before others do

If you have no clear plan for your time, your colleagues will happily decide for you. An empty, open calendar is an invitation to meeting after meeting.

Block time in your calendar for three things:

  • Focused work on your most important tasks.
  • Meetings and 1:1s, so you control when most of them happen.
  • Email, admin and coordination with your team.

Audit, then remove, reduce and rearrange

Alexis Haselberger, a productivity and time management coach who has worked with teams at Google, Lyft and other tech companies, recommends a regular review. Look at every meeting on your calendar. Ask whether it is worth your time, and whether its current format works best.

If you are not sure, track your meetings for a few weeks. Color them red for unproductive, yellow for needs changes, and green for productive. Then apply three strategies.

Strategy
StrategyRemoveRemove truly unproductive meetings.

Tell coworkers you do not need an invite to every meeting and your feelings will not be hurt. You can also send a direct report in your place.

StrategyReduceReduce how often a meeting happens, how long it lasts or how many of your team attend.

Calendars default to 30- and 60-minute slots, so a 15-minute standup may be enough.

StrategyRearrangeRearrange what is left.

Turn a “Swiss cheese calendar,” full of holes, into larger blocks of open time for deep work.

Source: How to protect your calendar against unnecessary meetings.

Then protect the result. An executive assistant can decline meetings outside the types you accept. Without one, a scheduling tool like Calendly lets you approve everything that goes on your calendar.

Campaign for better meetings too. Haselberger suggests a bold stance: "I don't show up at a meeting unless there's an agenda." Agree as an organization on what meetings are for, so simple project updates go by email.

People often worry they will be judged for saying no. Haselberger finds that colleagues are usually happy, and often want to be more like you. Organizations change constantly, so repeat the whole process every few months.

Don't over-cut: Stay in the loop cheaply

Trindade warns against rejecting too many meetings. A team that is misaligned in execution needs to realign later, which costs more time in ad-hoc conversations and meetings. In several roles, he cut the number of team meetings by focusing on a well-run daily standup.

To stay informed without constant status requests, use a mix of sources.

STAY IN THE LOOP without status requests Ticket boardsas long as they stay organized 1:1s and skip-levelsto understand concerns Metricsat different levels Written updatesthat replace meetings A few sync meetingsfor specific contexts
Scroll sideways →Source: A leader’s guide to effective time management.

To test whether your mix works, ask whether you notice problems while they are still small. If you only learn about issues once they are complex, strengthen these tactics.

TRY THIS TODAY

Goal: Measure your calendar against your job, and decide what happens to every recurring meeting.

  1. Write a job description for your role, with your responsibilities and goals grouped under people, technology and process.
  2. Export the last few weeks of your calendar. If your company allows it, paste both into your AI assistant with this prompt, or work through the same steps by hand:
    Prompt
    Here is my job description as an engineering manager, grouped into
    people, technology and process, followed by a few weeks of my calendar.
    
    1. Map each calendar event to one area (people, technology, process)
       or "none".
    2. Give the hours per area, and the share of my working hours with
       no meetings.
    3. List every recurring meeting with its length, frequency and number
       of attendees.
    Return tables only. Do not add recommendations.
  3. Mark each recurring meeting red for unproductive, yellow for needs changes, or green for productive.
  4. Remove the reds. Reduce the yellows by frequency, length or attendees. Rearrange what is left into larger blocks of open time.

Expected result: your hours per area, your meeting-free share against Trindade’s 30%, and a remove, reduce, rearrange or keep decision for each recurring meeting.

5.2

How to run meetings worth attending

Team meetings run long, lack a purpose or turn into status updates. Remote teams can sit in meeting after meeting and still feel disconnected. This lesson covers how to decide whether a meeting should exist, how to run it well, and how to keep a remote team connected.

What a bad meeting costs

Danielle Leong, Director of Engineering for IAM at GitHub, lays out the costs in her guide to meetings that don't suck (as much). At tech salaries, a meeting costs $60–100 per person per hour, and more with senior people in the room.

Meetings where people feel their opinions don't matter drag down morale. The switch in and out of meetings also hurts productivity. Engineers and managers both need focus time for hard problems.

Five qualities of a good meeting

Leong designs meetings to meet five standards.

Quality
QualityUsefulAsk why you are having the meeting, and whether people tune out.

Regularly review recurring meetings, ask attendees for feedback, or cancel one and see if anyone notices. Treat your meetings like any other engineering process.

QualityFocusedIf you can’t answer these questions when you schedule a meeting, cancel it.
  • Who is leading this meeting?
  • Why are we having this meeting?
  • What is the purpose?
  • What is the agenda?
  • What are the action items?

Keep different types of meeting separate, such as standups, kickoffs, syncs, strategy sessions, retros and social time. Steer chatty people back to the agenda.

QualityAs short as possibleAim for the shortest time, because you can always add a follow-up.

Her suggested lengths, which you can adjust to your team.

01 HR2 HR3 HR Standup10 minutes, three times a week Weekly team sync30 minutes RetrospectiveOne hour a month, plus an async issue Office hours and coffee talk30 minutes, twice a month each Project kickoffOne hour, as needed Strategy or working sessionOne to three hours, in one-hour chunks with breaks
QualityDocumentedWritten notes help people in other time zones feel included, help shy people contribute, and keep everyone accountable.

Someone who can’t attend, like a parent, can catch up later. Fewer people then feel they must attend live.

QualityOn timeLeong starts her meetings one minute after the hour and ends exactly on time or earlier.

If she runs late, she tells people to start without her.

Source: How to have meetings that don’t suck (as much).

How to run meetings for a remote team

Jason Lengstorf, founder of CodeTV and former VP of Developer Experience at Netlify, heard two common complaints from remote teams. People had too many meetings that did not feel useful, and they felt disconnected from their team. In his guide to meetings that build community in a remote team, he argues that many teams hold the wrong kind of meeting.

Status meetings are hard to stay engaged with, and are usually better as an async post. But teams that dropped meetings altogether felt disconnected, and without trust, teamwork is exhausting.

On his team at Netlify, the first five to ten minutes of most meetings go to stories and jokes. He calls that 10–15% of each meeting a "secret weapon," because it built trust before most of the team had met in person.

His seven techniques, meant for the two to twelve people who work closely together:

  1. At least once a week, hold a meeting that's longer than it needs to be. His team could finish weekly planning in 30 minutes, but schedules an hour to chat.
  2. Avoid meetings that need no discussion. Ask what people gain that a Slack message or email would not give them.
  3. Call a meeting when an async discussion gets abstract or heated. Then write down the outcome.
  4. Invite quieter coworkers in. Put discussion questions in the agenda beforehand, so people can think and write first.
  5. Don't be afraid of short, ad hoc calls. Five minutes of screen sharing beats an email full of screenshots.
  6. Create hangout calls for coworking. People join to work alongside each other and ask for help.
  7. Be patient and consistent. Unstructured time can feel awkward at first, and connection grows as the team builds shared context.

Leong's view is that every meeting should be as short as possible. Lengstorf's view is that a small remote team needs at least one meeting a week with deliberate room to chat.

How to make meetings inclusive

Jossie Haines, an executive leadership coach who drew on leadership roles at Apple, Tile and Zynga, describes how Tile made meetings a place for open dialogue. A facilitator made sure nobody was cut off or dismissed. Note-taking rotated, and nobody judged or questioned ideas during brainstorming.

Tile also used a traffic-light check-in. At each daily standup, every person shared a color for their personal well-being, not their work progress:

  • Green: feeling great and ready to engage fully.
  • Yellow: something is amiss.
  • Red: facing significant challenges that day.

The check-in was about sharing and understanding, not judgment or solutions. It gave managers a view of the team's emotional state, and helped teammates treat each other with more understanding.

5.3

How to run retros where people are honest

In a retro, the loudest voices can dominate, people hold back, and the action items never get done. This lesson covers how to make a retro feel safe, a five-step agenda, and how to facilitate so every voice is heard.

What a retro needs

GitLab, the DevSecOps platform company, which runs its management practices in a public handbook, holds a retro at the end of each release. Its guide to group retrospectives names two requirements:

  • A safe environment for feedback and discussion.
  • A plan that moves the discussion from facts to conclusions.

A smooth iteration may not need a safe space, and an iteration with obvious problems may not need a plan. But even iterations that seem fine on the surface can hide deep problems, so always come prepared.

How to make the retro safe

What went well is easy to discuss. What went wrong is touchy, and without safety, issues go unmentioned. GitLab recommends five practices:

  • Use an impartial moderator. If people think the moderator has a stake, they may not feel safe to disagree. Normally the manager moderates. If you want to take part, make clear you speak as a participant, or ask a peer or director to moderate.
  • Encourage emotions. Lines like "I was angry when…" or "It made me sad that…" show how intense an issue is and expose problems that are otherwise hard to find.
  • Have all parties present. If someone's role or work will come up, including stakeholders outside the group, invite them to contribute.
  • Collect feedback async first. An issue lets everyone think and record feedback on their own time.
  • Meet face to face after a hard iteration. When emotions may run high, a live video retro is almost always worth the cost. Some groups do not record it, and some leave out managers who directly manage the group, so people can speak freely.

A five-step agenda

Without a plan, a few "loud voices" can dominate the retro, or the talk stays on facts and feelings and never reaches conclusions. The moderator makes sure the agenda is followed and completed. GitLab's general pattern has five steps.

1 · Introduction Remind people of the purpose, and keep the conversation scoped to the project or iteration under review. 2 · Gather data Collect facts without conclusions, for example with a timeline or “what made you mad, sad or glad?” 3 · Generate insights Look together for patterns and causes: “because we did x, y happened.” 4 · Decide what to do Identify action items, such as process changes or experiments for the next iteration. Consider a vote on which matter most. 5 · Close the retrospective Give everyone positive feedback on their contribution, and note any surprising results. Assign every action item to one or more people, with clear expectations for when it is done.
Scroll sideways →Source: Group Retrospectives.

Facilitate, don't manage

Pat Kua, a technology leader and author of The Retrospective Handbook, describes the worst retro he attended in his guide to inclusive meetings. A project manager, "Steve," drew two columns on a whiteboard. He pointed at one person at a time, asked what was working well or going badly, and wrote up what he heard.

A facilitator works differently and stays in the background as much as possible. Help participants talk to each other rather than through you. In a room, set the chairs in a circle instead of rows facing the front, or let each speaker take your place at the front.

Watch the power dynamics too. When a manager or lead facilitates, people from a high power-distance culture, or people who give more weight to authority, read your words as heavier than anyone else's. Some will agree because of your role, and others will not share ideas because they expect you to have the answer.

To counterbalance this, share your opinion after everyone else. Encourage all ideas, ask questions that invite quieter people to speak, and thank people for taking part before you give your own view.

Idea-writing over idea-storming

When people share ideas one by one, the speaker influences the room. Someone may decide their own idea is not so good after all. A facilitator who is not actively listening may also write up their own interpretation, which adds more bias.

Kua recommends idea-writing instead.

STEP 1 Give everyone a timebox, such as five to ten minutes. STEP 2 Each person writes down as many ideas as they can, without seeing anyone else’s. STEP 3 When everyone has finished, put all the ideas up together and group related or duplicate ones.
Scroll sideways →Source: Three ways to run inclusive meetings.

Remotely, people can write ideas in their own space, then paste them onto a shared whiteboard like Miro or Mural at the same time. Everyone contributes at once, without bias from whoever spoke first.

The Code: Your daily unfair advantage in software engineering.

Join 350,000+ software engineers, tech leads, and CTOs who start their morning with The Code.

Subscribe to Newsletter
5.4

How to delegate without losing control

Managers either hoard work or hand it off and then hover. Either way, they become the bottleneck, or the people they delegate to struggle. This lesson covers what to delegate, how to hand work off, and how to stay informed without micromanaging.

Decide what to delegate

Jason Wong, who led multiple engineering teams as a director, first used the Eisenhower matrix in his guide to effective delegation. The matrix sorts tasks on two axes, important or less important and urgent or less urgent.

URGENTLESS URGENT IMPORTANTLESS IMPORTANT Do it immediately Such as preparing a presentation for your manager. Schedule it for later Delegate it Such as a first phone screen with a candidate. Delete it
Scroll sideways →Source: Tools for effective delegation in engineering management.

The matrix stopped working when Wong became a manager of managers. Many business-critical tasks were both important and urgent, and he still had to delegate them, because he lacked the time or the expertise. So he asked a simpler question: "What are the things that my title or position uniquely enable me to do?"

As a director, his title let him decide how to split new headcount across his teams, because he could see the tradeoffs. Managing a development team day to day was not unique to his role, so he hired someone to take it on.

He also delegates for growth. At times he hands a report a meeting or project that only his position could cover, as a development opportunity. It raised doubts like "Am I delegating myself out of a job?", but he learned to get over them.

State the outcome and the constraints

Describe the task in two parts: the desired outcomes and the constraints. Make the implicit explicit. The concerns that stoke your anxiety and erode your confidence in others are often the ones you never said but expect people to "just know."

The "passing grade" version works for well-understood work. For less clear work, add context.

Well-understood work“Here’s the project I need you to lead. The final solution needs to do X, Y, and Z and I need it done by the end of the quarter.”
Less clear work · add contextWong’s example explains the company goal behind the project, why it has to be done by the end of the quarter, and who the main stakeholder is.

Source: Tools for effective delegation in engineering management.

The lead then works directly with that stakeholder, and you are not the messenger in the middle.

Hand it off and coach it through

Yenny Cheung, VP of Engineering at Bluefish, struggled with advice to "delegate often" in her first 90 days as a manager. She was still accountable for the team's deliverables, even when things went wrong. She now runs four steps:

  1. Carve out the responsibility. Set expectations early, and align the engineer on what great work looks like.
  2. Coach through challenges. Unblock the engineer, and connect them with the right people.
  3. Verify the results. Run a retrospective with them on what went well and what could improve, then give feedback.
  4. Close it out. If the work was great, celebrate the win with the team and vouch for it up the management chain. If not, take accountability for the failure, but also hold the engineer accountable for what they can improve, and support them next time.

Delegate cleanly, then stay informed

Once you hand off the work, Wong steps out of the communication loops. He leaves the team meetings, silences the Slack channel, filters his email, and refers questions to the new lead. This creates a clear sphere of influence for the lead. It takes discipline, especially when you were the expert and could answer faster yourself.

You still own the result, so define how the lead reports status. Wong uses a templated written report each week, but 1:1s also work. Make clear what data you want and how often. The cadence is your "sampling rate," so increase it if a project starts to slip.

Name your feelings instead of hiding them. "It makes me nervous that half your team is going on vacation at the same time. How are you feeling about it?" opens a conversation that aligns your context with the lead's.

Delegated work will sometimes fail. When it does, help the person pick up the pieces, and do not let one data point stand for all their work. The true test of a manager's support is to show confidence and trust through both the peaks and the valleys.

5.5

How to land projects stuck at 90%

Projects stall near the finish line. Late requests pile up, scope creeps and the team's energy fades. This lesson covers why the last stretch is hard, how to land a project, and how to stop the stall before it starts.

Why the last 10% is the hardest part

James Stanier, who went from early engineer to VP Engineering at Brandwatch and later worked at Shopify and Nordhealth, compares the end of a project to landing a plane. The landing demands a different kind of skill, and it is where most of the risk accrues.

Part of the difficulty is structural, as the ninety-ninety rule shows.

WORKTIME First 90% of the work 10% 90% of the time The other 90%
Scroll sideways →Source: Landing the plane.

The end is where you hit edge cases, integration problems and many small decisions nobody saw at the start.

The rest is psychological. Novelty is easier to desire than completion, and nobody gets excited about migration scripts.

People also underestimate how long tasks take, and that hits hardest at the end, where the work is hardest to estimate. Under pressure, teams reach for easy tasks to feel progress, while the finish line keeps moving.

The quiet death

Projects rarely fail outright. More often, the project that was "almost done" three months ago just fades away. The team moved on, the tickets sit untouched, and nobody decided to stop.

"95% done" is the most expensive state a project can be in. You have made the maximum investment but delivered zero value.

The cost compounds. When projects routinely fade, trust erodes between engineers and leadership, and the next ambitious project starts with skepticism instead of excitement. Unfinished work also keeps a low-grade load on everyone's mind.

The "one more thing" trap

Once there is a working demo, everyone has opinions. "Can we add dark mode before launch?" Each request sounds reasonable and small, and each pushes the finish line further away.

Your own team does it too, with lines like "We should refactor this module before we ship." These requests are hard to argue against because they sound good.

In this phase, protecting scope becomes your primary job. "Done enough" means shipping, not settling.

How to land the project

In the middle of a project, your job is to create space for the team. In the final stretch, it shifts to tighter involvement, which is not the same as micromanagement:

  • Increase your cadence. Move from weekly check-ins to twice a week or daily, so you spot problems before they compound.
  • Protect scope ruthlessly. Every new request gets the same answer: "That's a great idea for v2." Keep a single, prioritized list of what is left.
  • Overcommunicate with stakeholders. A brief daily update ("here's where we are, here's what's left, here's when we expect to ship") is cheap insurance against scope creep.
  • Favor systems over heroics. A late-night push usually means something went wrong upstream. Use a checklist of what must happen before shipping, in what order, and who owns each item.
  • Shield the team from new requests. When a late requirement truly can't be refused, trade something out: "We can add this, but something else has to come out. Which is it?"

After you ship, close the project well:

  • Run a proper retrospective, with genuine reflection on what worked and what didn't.
  • Celebrate the landing. Marking the end matters more than the scale of the celebration. Name specific contributions.
  • Plan for the energy dip. Give the team a beat before the next big initiative.

The ending matters because people judge an experience mostly by its peak and its end. Teams that keep living through bad endings stop volunteering for the hardest projects.

Prevent the stall from the start

Krithika Chandramouli, a software engineer at Meta who led a project across three teams, shares habits from leading large cross-functional projects:

  • Know the unknowns. Seek out external dependencies, unclear feasibility and unfamiliar systems early, and keep a written list of them.
  • Set sustainable timelines and scope. Either the timeline depends on the scope, or you prune the scope to fit the timeline. Her mentor's rule: "If you estimate something to take x weeks, in reality, it is likely to take 3x weeks."
  • Maintain a changelog. Log every decision that changes the work, such as a new metric from your PM or a possible blocker.
  • Keep every stakeholder in the loop. Some want milestone updates, some weekly and some daily. Set a cadence for each, and follow through.

Try this today

TRY THIS TODAY

Goal: Find every project stuck near the finish, decide its fate, and set up your next launch to land.

  1. List every project your team has in flight, and when each was first called “almost done.”
  2. For any project that has sat at 90% for more than a couple of weeks, decide whether to push it to finish or to stop it.
  3. Before your next launch enters its final stretch, run a pre-mortem. Ask your team, “How could this ending go badly?”
  4. Build a landing checklist around the risks they name:
    landing-checklist.md
    Scope freeze date:
    Stakeholder update cadence:
    Shipping criteria:
    Retro date:
    Celebration plan:
    
    Before shipping (in order):
    | # | What must happen | Owner |
    |---|------------------|-------|
    | 1 |                  |       |

Expected result: a finish-or-stop decision for every stalled project, and a landing checklist for your next launch, built around the risks your team named.

Source: Landing the plane.

END OF MODULE 5

By this point you should have:

  • Written a job description for your role and audited your calendar against it.
  • Removed, reduced or rearranged your weakest meetings.
  • Applied the five-question test to your team's recurring meetings.
  • Run a retro with an impartial moderator, a clear agenda and silent idea-writing.
  • Delegated at least one task with an explicit outcome, constraints and status cadence.
  • Audited your projects for anything stuck at 90%.